Dear Sir,
In Batch Integration, jobs are running based on the manually running time and not from the setting-up time. I set up to run at 8 pm. Before that, the job fails and I run manually at 3 pm. On the next day, the job running time change to 3 pm automatically rather than 8pm. I already uncheck set next run time based on end-time check box too. Please help me with this issue.
Thanks
Phu