Developer forum

Forum » Integration » Important: Schedule Job Running Time

Important: Schedule Job Running Time

Dynamicweb Employee
Thet Nong Phu
Reply

Dear Sir,

In Batch Integration, jobs are running based on the manually running time and not from the setting-up time. I set up to run at 8 pm. Before that, the job fails and I run manually at 3 pm. On the next day, the job running time change to 3 pm automatically rather than 8pm. I already uncheck set next run time based on end-time check box too. Please help me with this issue.

Thanks

Phu


Replies

 

You must be logged in to post in the forum