Hello,
I try to use a JobFinished subscriber, but I notice that the JobFinishedIntegrationArgs don't include the Job like it used to in DW 8.
The documentation does mention it (http://doc.dynamicweb.com/api/html/2ce3769f-552f-5488-5cf7-5b6557da5fbc.htm), but it doesn't seem to actually be there (see screenshot).
Edit : I can see that the documentation refers to v1.0.14. The version shipped with 9.2.15 is 1.0.10.
Thanks