Hi guys,
Is there any guide I can use for a (as close as possible) step-by-step migration from Dw9 to DW10?
I have a solution that has a lot of content, it is based on Swift (but with considerable customization) and I need to move it from DW9 on-premise to DW10 Cloud.
It would be helpful to be aware of the challenges and process.
Thank you,
Adrian